check out the new remote control Jockey Wheel SmartBar Canegrowers rearview170 Cobb Grill Skid Row Recovery Gear Caravan Industry Association of Australia
Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: Snowy Hydro 2.0


Guru

Status: Offline
Posts: 1413
Date:
Snowy Hydro 2.0


Original cost estimate for the complete project was 2bn, todays news report states new completed cost to be 12bn and years late, how do they manage it? pun intended...



__________________

I reserve the right to arm bears :)



Guru

Status: Offline
Posts: 7341
Date:

Farming out to private enterprise with vested interest.



__________________

Procrastination, mankind's greatest labour saving device!

50L custom fuel rack 6x20W 100/20mppt 4x26Ah gel 28L super insulated fridge TPMS 3 ARB compressors heatsink fan cooled 4L tank aftercooler Air/water OCD cleaning 4 stage car acoustic insulation.



Guru

Status: Offline
Posts: 700
Date:

peter67 wrote:

Original cost estimate for the complete project was 2bn, todays news report states new completed cost to be 12bn and years late, how do they manage it? pun intended...


 

 

 

Ask the responsible Minister, that's bound to get you the "right" answer and "justification"  biggrin



__________________


Senior Member

Status: Offline
Posts: 335
Date:

Whenarewethere wrote:

Farming out to private enterprise with vested interest.


 Tell me about it!!!

I am about to go on the attack with the disgraceful manner in which Reflections manage NSW state owned assets.

I was fishing at Talbingo not so long ago and there was a promotion day outside the post office in the village. I picked up a heap of drilling data and had a chat with some of the drilling people there.

Lots of fancy brochures and even a cardboard model to make of "Florence".

It appears the cardboard model handed out works much better than Florence herself.

She has been stuck for 18 months !!!

Plenty of budget apparently to spend on public relations.......



__________________

Ron



Guru

Status: Offline
Posts: 723
Date:

Over 35 years ago, I was part of a team looking for more Hydro sites. This was a broad brush approach, an we looked at the possibility of Tantangara to Talbingo as a possible site. This option was quickly abandoned because the geology was likely to be difficult. Also, we had a rule of thumb where the length of tunnel divided by the head (difference between reservoir elevations) should be about 3. This site was about 5, meaning that typically the cost of tunnelling would be very high and therefore make the project unviable.

As for the contractural arrangements, my mind still boggles.

Having said all this (and a lot more unsaid), I am pleased that finally someone has started to invest in the future, NOW instead of waiting until we run out of generating capacity. Technically, Snowy 2.0 is really brilliant. It is pushing the limits of technology. Regarding the Electrical and Mechanical equipment, I totally agree with the choice of contractor, even though there was no competitive bidding. They are going to have there hands full getting it right, but I feel sure they can do it.

I have no idea as to the technical ability of the people working on this scheme. This is a worlds best scheme, and the quality of the design and contract management will have to be worlds best as well. Personally, I am glad that I am past it, and unable to work on the scheme, but equally, I am insanely jealous of those who are working on the scheme. My main regret is the lack of information issued by Snowy Hydro. They are between a rock and a hard place (pardon the pun) because the $2 billion and 2024 completion data was announced by Malcolm Turnbull, based no doubt on information supplied by someone who had no idea. The current cost estimates and project times are more realistic, but are still estimates. They could still overrun before project completion..

__________________


Senior Member

Status: Offline
Posts: 335
Date:

erad.

Informative contribution.

As to the information supplied for the scheme.

I think it came from the Utopia team at the ABC........

__________________

Ron

Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.

Tweet this page Post to Digg Post to Del.icio.us
Purchase Grey Nomad bumper stickers Read our daily column, the Nomad News The Grey Nomad's Guidebook