check out the new remote control Jockey Wheel SmartBar Canegrowers rearview170 Cobb Grill Skid Row Recovery Gear Caravan Industry Association of Australia
Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: Built to my Queen's specifications.


Senior Member

Status: Offline
Posts: 144
Date:
Built to my Queen's specifications.


It has taken just over eighteen months to complete, and there is still a lot of trimming and fiddly bits to finish off. But all in all, we are happy to have done all the work ourselves, and everything works as intended.



Attachments
__________________

A person with experience is never at the mercy of a person with an argument.



Guru

Status: Offline
Posts: 1482
Date:

Clever clogs!.

Seriously, well done looks really great.Lovely warm coloured wood.

When is your first trip Dave?



__________________

 

 

 

 

Safe Travels



Guru

Status: Offline
Posts: 1619
Date:

How good is that! Well done, thanks for the pics.

__________________

Janette



Senior Member

Status: Offline
Posts: 180
Date:

I agree.
Well done.

__________________

Live your dream.



Guru

Status: Offline
Posts: 625
Date:

Brill job so well done that man


__________________


Guru

Status: Offline
Posts: 644
Date:

Very clever of you, fantastic job...well done. Glenda

__________________

Glenda and Gary Oliver 2010 Pajero with 2008 19 ft Jayco Sterling Our Blog: http://www.birdshootaustralia.blogspot.com http://www.birdshootuk.blogspot.com.au



Guru

Status: Offline
Posts: 8735
Date:

Great job Palebushman.  Looks very professional.

Cheers,

Sheba.



__________________
An it harm none, do what you will.


Senior Member

Status: Offline
Posts: 162
Date:

Palebushman wrote:

It has taken just over eighteen months to complete, and there is still a lot of trimming and fiddly bits to finish off. But all in all, we are happy to have done all the work ourselves, and everything works as intended.

Top job.Well done PB.Obviously the "Boss"was your guiding light.winkbiggrin 

 



__________________


Chief one feather

Status: Offline
Posts: 17339
Date:

Wow what a transformation Bill. That looks great. Job well done. Now you can sit back and enjoy all that hard work.



__________________

Live Life On Your Terms

DOUG  Chief One Feather  (Losing feathers with age)

TUG.......2014 Holden LT Colorado Twin Cab Ute with Canopy

DEN....... 2014 "Chief" Arrow CV  (with some changes)

 



Senior Member

Status: Offline
Posts: 492
Date:

Hi all;

       What a fantastic job well done, If you don't mind answering a couple of questions .....

1/ What size is you bus ....sorry motorhome.

2/ What type of fuel eccominy are you getting

3/ What size is the motor.

4/ And lastly how about a few more photos. And once again ......Well done

 



__________________


Senior Member

Status: Offline
Posts: 152
Date:

Oh, that's so good. Very impressed:) Mine was custom built by a couple and the wood is beautiful, a bit heavier than the normal van build but it's worth it


You've done a fantastic job

Jo


__________________


Guru

Status: Offline
Posts: 3683
Date:

I agree - a great job. Enjoy it.

__________________

NeilnRuth



Guru

Status: Offline
Posts: 700
Date:

Yep, looks great. do you have any exterior photo's ?

Johnw

__________________

There is no road to happiness. Happiness is the road.

Just Lovenit.


Wentworth Falls NSW



Senior Member

Status: Offline
Posts: 144
Date:

valiant81 wrote:

Hi all;

       What a fantastic job well done, If you don't mind answering a couple of questions .....

1/ What size is you bus ....sorry motorhome.

2/ What type of fuel eccominy are you getting

3/ What size is the motor.

4/ And lastly how about a few more photos. And once again ......Well done

 


 Hi Stephen,

Our bus is 9 meters long, that's about 29ft 6˝inches in old measures.
Never had air conditioning when in public service, hence we never had
any rust problems to deal with in the wall cavities. The chassis is also sound.
The floor is 30mm marine ply and is as good as it was 28 years ago, in fact
the way Austral/Denning (Brisbane) manufactured this bus is to be highly commended.

Simplicity + Ruggedness was obviously a premium requirement, for the company
that ordered these buses for their fleet, which is still based in Bendigo today.

Click on link below for a more detailed spec of the our engine.
http://www.diesel-engine.cn/ISUZU/6BD1T.htm

Our 6BD1-T is a 6-cylinder direct injection engine and displaces 5.7 litres,
on the open roads we get approx 5.3 litres to the kilometre, but around
cities and towns, this goes down to around 4.2.
These figures are pretty much the the same as what we used get from our
Toyota Coaster, which had a basic indirect injection 1HZ engine.
Amazing! When you consider the size and weight differences of the two buses.

The GVM of the bus is 13.5 Tonnes, but fully fuelled, watered up and all
provisions on board, she just makes it to 10 Tonnes, could probably reduce
that a little more, by off loading a lot of stuff that we haven't used for over a year.


 



Attachments
__________________

A person with experience is never at the mercy of a person with an argument.



Guru

Status: Offline
Posts: 3332
Date:

Wow!!!!!!!!!!!!!!!!!

__________________

The Drewsterz my band site

Milo Online  my personal site

Love what you do  Do what you Love!!   my motto in life !

 



Veteran Member

Status: Offline
Posts: 57
Date:

Well done,lovely paint job, you should be very proud of it Daryl

__________________
Gloria & Daryl


Senior Member

Status: Offline
Posts: 144
Date:

Wandering Whitfields wrote:

Well done,lovely paint job, you should be very proud of it Daryl


 whisper.gif No no Daryl,

Just like the rest of the bus shell, chassis and flooring. The 'Livery' is still all original, except the roof and white paint half way up, which we have put nine coats of a very reputable* heat resistant paint on.  Having a complete new 'Livery' is last on the major jobs list, we still find this original colour scheme quite appealing and have become quite attached to it too.

*Not sure if our webmistress permits 'plugging' the name of commercial products. reading.gif



__________________

A person with experience is never at the mercy of a person with an argument.



Senior Member

Status: Offline
Posts: 144
Date:

Thank you to you all, for your very kind words.



__________________

A person with experience is never at the mercy of a person with an argument.



Guru

Status: Offline
Posts: 967
Date:

That's really fantastic, congratulations. Happy travels

__________________


Senior Member

Status: Offline
Posts: 144
Date:

Palebushman wrote:
valiant81 wrote:

Hi all;

       What a fantastic job well done, If you don't mind answering a couple of questions .....

1/ What size is you bus ....sorry motorhome.

2/ What type of fuel eccominy are you getting

3/ What size is the motor.

4/ And lastly how about a few more photos. And once again ......Well done

 


 Hi Stephen,

Our bus is 9 meters long, that's about 29ft 6˝inches in old measures. **
Never had air conditioning when in public service, hence we never had
any rust problems to deal with in the wall cavities. The chassis is also sound.
The floor is 30mm marine ply and is as good as it was 28 years ago, in fact
the way Austral/Denning (Brisbane) manufactured this bus is to be highly commended.

Simplicity + Ruggedness was obviously a premium requirement, for the company
that ordered these buses for their fleet, which is still based in Bendigo today.

Click on link below for a more detailed spec of the our engine.
http://www.diesel-engine.cn/ISUZU/6BD1T.htm

Our 6BD1-T is a 6-cylinder direct injection engine and displaces 5.7 litres,
on the open roads we get approx 5.3 litres to the kilometre, but around
cities and towns, this goes down to around 4.2.
These figures are pretty much the the same as what we used get from our
Toyota Coaster, which had a basic indirect injection 1HZ engine.
Amazing! When you consider the size and weight differences of the two buses.

The GVM of the bus is 13.5 Tonnes, but fully fuelled, watered up and all
provisions on board, she just makes it to 10 Tonnes, could probably reduce
that a little more, by off loading a lot of stuff that we haven't used for over a year.


 


** These figures relate to the distance from the front axle to the rear axle.             The overhaul length of the bus is actually 11.5 meters = 37.729 658 793 feet.

Edited for clarity, my apologies for the mistake.



__________________

A person with experience is never at the mercy of a person with an argument.

Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.

Tweet this page Post to Digg Post to Del.icio.us
Purchase Grey Nomad bumper stickers Read our daily column, the Nomad News The Grey Nomad's Guidebook